Items
|
Injection plastic mold for robotic vacuum cleaner
|
Parts materials
|
ABS
(also other material like PP, PE, PS,Acrylic, PC+ABS, PP+TD20%, PU, PA6, PVC,PETG)
|
Mold base steel
|
NAK80, S136, SKD61,45, S55C, P20, 1730, 2738, 718h, H13, BPMHH, 2343ESR
|
Core and cavity steel
|
NAK80, S136, SKD61, P20,1730hh, 2738hh, 718h, H13, BPMHH, 2343hh
|
Injection system
|
Edge gate, slid gate, sub gate, direct gate, pin point gate, valve gate
|
Mould standard
|
DME, LKM, HASCO
|
Cavity numbers
|
Multi
|
Runner
|
Hot or cold
|
Injection machine
|
100-1500T
|
Cycle time
|
10-30 seconds
|
Mold of steel suppliers
|
Assab, Daido, LKM, Buderus
|
Hot runners suppliers
|
Synventive, Yudo, Incoe, Hasco, DME, Moldmaster, HRS, Delachaux
|
Mould life
|
300,000 - 2,000,000 shots
|
Tooling lead-time
|
35-50 days depends on qty and complexity of mold
|
Design software
|
Pro/E, UG, Catia, Solidwork, Moldflow, AutoCad
|
Mould life
|
300,000-1,000,000 shots
|
Shipping packing
|
Wooden case or according to customer's requirements
|
Certificate
|
ISO9001:2015
|
Other vacuum cleaner molding parts sample picture:
Company Profile:
Green Vitality was founded in 1993, as starting from CNC processing in a small tooling building in Chang'an town, with nearly 30 years experience in custom tooling and injection molding, nowadays we have become one of the global famous mold makers in manufacturing large plastic injection molds.
With the modern business management system and ISO9001:2015 Quality System guideline, the sophisticated production techniques, the advanced manufacturing equipment, and our qualified and dedicated team, we are full of capabilities and have great confidence in offering you professional one-stop solution of mold designing, mold making, injection molding and beyond-value service.
Green Vitality make over 400 molds per year, mainly of the molds and plastic parts are exported to America, Germany, France, Turkey, Italy and other countries worldwide.
Team building:
FAQ
Below is a list of answers to most
frequently asked questions
about Green Vitality.
Q1:Are you trading company and manufacturer?
A1: Yes we are factory with advanced equipment, welcome your visit.
Q2:Which kinds of equipment in your workshop?
A2:Our company has 14 sets of computer CNC machining centers, high-speed carving CNC 9 units, large gantry CNC 2 sets of machining centers, EDM machine 6, currently the world's most advanced double spark machine, precision grinding six , three large water mill, lathe, milling machine 10, radial drill two sets, desktop drilling machine, deep hole drilling, 3 sets of 8 Fast thread cutting and other processing equipment, as well as ancillary products measured using three measurements yuan, two MEs, projection measuring instrument, hardness tester and other equipment, 23sets injection machines with robot arm and automatic feeding system.
Q3.What kind of payment conditions do you accept?
A3:Usually we accept standard payment conditions - that is: 40% of total prices down payment, 40% on mould first trial and 20% on mould delivery. Particularly, in case of bigger contracts. The preferable forms of payment are wire transfer and letters of credit. We often use a combination of those.
Q4:Can you provide the steel certificate and heat-treatment certificate?
A4:Yes, we can. The steel supplier and heat-treatment factory can provide the certificates.
Q5:How long is the lead-time for a mould?
A5:It all depends on the mould's size and complexity. Usually, the lead-time is about 25-45 days.
Welcome your visit our company.
It's our pleasure if we are able to work together with you to provide the value added service and help to make the optimum mold solution & product.
Contact us:
Green Vitality Industry Co., Ltd
Julia Zhu
|
|